Advanced Search
HUANG Yunke. Analysis of Risk Factors and Treatment Plans for Flooded Hydroelectric Power Plants[J]. RURAL ELECTRIFICATION, 2024, (3): 86-88. DOI: 10.13882/j.cnki.ncdqh.2024.03.021
Citation: HUANG Yunke. Analysis of Risk Factors and Treatment Plans for Flooded Hydroelectric Power Plants[J]. RURAL ELECTRIFICATION, 2024, (3): 86-88. DOI: 10.13882/j.cnki.ncdqh.2024.03.021

Analysis of Risk Factors and Treatment Plans for Flooded Hydroelectric Power Plants

  • In order to reduce the accident rate of flooded factory buildings and ensure the safe and reliable operation of the hydropower station, this study takes the operation status of Xinfengjiang Hydropower Station as an example, analyzes the risk factors of flooded factory buildings, designs water source monitoring points, constructs an intelligent monitoring system based on wireless communication, and monitors real-time water level online; Design emergency plans, carry out pre prevention, in-process control, and post disposal, strengthen risk prevention and control of hydropower plant flooding.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return