Thinking and Practice on Coordination Management of Civil Construction and Electrical Engineering in Substation
-
Graphical Abstract
-
Abstract
In order to comprehensively improve the quality of substation civil engineering projects, a standardized coordination management mechanism is implemented based on the actual situation of the project, and a controllable and scientific control mode is jointly established to better reduce the resources and costs of cross operation, and maintain the basic effect of unified management of substation engineering projects. The article briefly analyzes the significance of coordinated management between civil construction and electrical engineering in substations, and discusses the specific management content.
-
-