Citation: | JIANG Hua. Design and Realization of Electric Power Digital Survey Individual Soldier System Based on GIS[J]. RURAL ELECTRIFICATION, 2022, (2): 59-62. DOI: 10.13882/j.cnki.ncdqh.2022.02.018 |
In the electric power design and survey stage, in order to determine the position of the pole and tower, it is necessary to nail the wooden pile on the site position. During the construction of the pole and tower, the pole and tower construction and installation should also be carried out according to the position of the wooden pile. In addition, it will also lead to illegal construction and planting of trees due to the existence of physical piles in the construction area of the poles and towers, thereby increasing the cost of clearing the project passages. Use GIS and high-precision navigation equipment to construct an electric digital surveying individual soldier system. The application of this system in actual projects shows that after the individual soldier system is used, the pegging work for the field positioning of the poles and towers can be removed, which greatly improves the project The progress of the project saves costs and can provide technical ideas for power surveys in other regions.
[1] |
姜礼俊, 夏光平, 曹楠, 等. 基于北斗和GIS的定向运动服务系统设计[J]. 测绘与空间地理信息, 2020, 43(12): 161-163+167.
|
[2] |
徐果. CORS测量技术应用探讨[J]. 设备管理与维修, 2021(14): 87-88.
|
[3] |
毛琪. 车载GNSS定位实时动态检测技术研究[D]. 东南大学, 2016.
|
[4] |
李源, 李金忠, 薛国鹏, 等. CircleChat: 基于SpringBoot和Uni-App框架的圈聊平台的设计与实现[J]. 井冈山大学学报(自然科学版), 2021, 42(03): 64-71.
|
[5] |
薛宁. 基于WebService实现跨部门在线数据交互[J]. 审计月刊, 2021(01): 37-40.
|
[6] |
陈伟航, 李强. 基于Luban图片压缩算法在即时聊天App中的应用[J]. 电子设计工程, 2019, 27(06): 46-50.
|