Advanced Search
Wang Guolin. Researches of Overvoltage due to 330 kV No-load Line Asynchronous Switching in[J]. RURAL ELECTRIFICATION, 2021, (7): 18-20. DOI: 10.13882/j.cnki.ncdqh.2021.07.005
Citation: Wang Guolin. Researches of Overvoltage due to 330 kV No-load Line Asynchronous Switching in[J]. RURAL ELECTRIFICATION, 2021, (7): 18-20. DOI: 10.13882/j.cnki.ncdqh.2021.07.005

Researches of Overvoltage due to 330 kV No-load Line Asynchronous Switching in

More Information
  • Received Date: February 02, 2019
  • [1]
    徐士珩, 李同生, 林集明, 等. 非同期合闸过电压及其限制[J]. 电机工程学报, 1982, 25(03): 12-24.
    [2]
    侯宗毅, 周雪梅, 冯春华. 非同期合闸过电压模型的概周期解[J]. 桂林电子科技大学学报, 2008, 28(02): 100-103.
    [3]
    张帆, 段雄英, 吕洋, 等. 选相投切特高压线路及对其操作冲击绝缘的影响[J]. 电工技术学报, 2018, 33(05): 1151-1157.
    [4]
    刘振亚. 特高压交流输电系统过电压与绝缘配合[M]. 北京: 中国电力出版社, 2008.
    [5]
    吴文辉, 曹祥麟. 电力系统电磁暂态计算与EMTP应用[M]. 北京: 水利水电出版社, 2012.
    [6]
    王国林. 基于ATP-EMTP的330 kV空载线路合闸过电压仿真分析[J]. 电工电气, 2019, 39(09): 34-37.
  • Related Articles

    [1]LYU Le, YAN Yuehao, SUN Minghao, ZHAO Zhenshan, Guo Xing, LI Rui. Analysis of Switchgear Overvoltage Burnout Trip Caused by 10 kV Grounding[J]. RURAL ELECTRIFICATION, 2024, (12): 109-111. DOI: 10.13882/j.cnki.ncdqh.2402A020
    [2]SUN Dezhou, ZHANG Quanyuan, DONG Zhanxiang, LIANG Zhilei, KANG Xintong. Analysis of No-load Closing Frequency Voltage Rise and Bus-side Disconnect Switch Phase A Ground Faults on 220 kV Line[J]. RURAL ELECTRIFICATION, 2024, (5): 46-52. DOI: 10.13882/j.cnki.ncdqh.2024.05.012
    [3]ZHU Hongru, CHANG Dongsheng, ZHANG Wenchang, WU Deyu, WANG Hailong. Analysis of a Switch Trip Event During the Operation of a 330 kV Line[J]. RURAL ELECTRIFICATION, 2024, (4): 89-91. DOI: 10.13882/j.cnki.ncdqh.2024.04.025
    [4]ZHANG Zhiyu, ZHANG Wei, CAO Chenrun, ZHOU Gang. Analysis of a Failure of Remote Closing of 220 kV Substation Line Switch[J]. RURAL ELECTRIFICATION, 2022, (10): 48-51. DOI: 10.13882/j.cnki.ncdqh.2022.10.011
    [5]Dai Lijun, Wang Bowen, Li Chen, Yang Xia. Artificial Analysis of Earthing Form and Earth-free Form of Clamp Protector When Line is Lightning Stroked[J]. RURAL ELECTRIFICATION, 2021, (4): 26-27. DOI: 10.13882/j.cnki.ncdqh.2021.04.008
    [6]Kong Xianzuo, Wang Yiming, Ma Yuli, Meng Jun. Researches of Influence of Lightning Conductor and Line Coupling Action on Divided Flow Factor of Earthing Lightning Current from Poles and Towers[J]. RURAL ELECTRIFICATION, 2021, (3): 29-33. DOI: 10.13882/j.cnki.ncdqh.2021.03.009
    [7]Wen Qingquan. Simple Analysis and Operating Season and Preventive Measure Sited to Main Transformer Gap zero-sequence Over Voltage Protection[J]. RURAL ELECTRIFICATION, 2020, (8): 33-35. DOI: 10.13882/j.cnki.ncdqh.2020.08.010
    [8]Wang Yuming, Zheng Ting, Zhu Yu. Research of Treatment Method for Disconnecting Switch Fault Occurred in Switching Operation in Substations[J]. RURAL ELECTRIFICATION, 2018, (1): 31-33. DOI: 10.13882/j.cnki.ncdqh.2018.01.009
    [9]Lai Junju. Overvoltage Protector Adopted Wireless Monitoring System[J]. RURAL ELECTRIFICATION, 2017, (11): 37-39. DOI: 10.13882/j.cnki.ncdqh.2017.11.015
    [10]Xie Zongxi, Zhang Ting. Application of SVR Line Automatic Voltage Regulator in 10 kV Line Low Voltage Administering[J]. RURAL ELECTRIFICATION, 2017, (7): 9-10. DOI: 10.13882/j.cnki.ncdqh.2017.07.003

Catalog

    Article views PDF downloads Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return