Citation: | Duanmu Juncheng, Yuan Yue. Fast Reconfiguration Related to Distribution Network Considering Stochastic Wind electric Power[J]. RURAL ELECTRIFICATION, 2020, (3): 64-67. DOI: 10.13882/j.cnki.ncdqh.2020.03.022 |
[1] |
史常凯, 徐斌, 孟晓丽, 等. 智能配电网条件下的网络重构与供电恢复探讨[J]. 电力建设, 2012, 33(1): 12-16.
|
[2] |
PENG Q Y, TANG Y J, LOW S H. Feeder reconfiguration in distribution networks based on convex relaxation of OPF[J]. IEEE Transactions on Power Systems, 2015, 30(4): 1793-1804. doi: 10.1109/TPWRS.2014.2356513
|
[3] |
AHMADI H, MARTI J R. Linear current flow equations with application to distribution systems reconfiguration[J]. IEEE Transactions on Power Systems, 2015, 30(4): 2073-2080. doi: 10.1109/TPWRS.2014.2360363
|
[4] |
DING F, LOPARO K A. Feeder reconfiguration for unbalanced distribution systems with distributed generation: a hierarchical decentralized approach[J]. IEEE Transactions on Power Systems, 2016, 31(2): 1633-1642. doi: 10.1109/TPWRS.2015.2430275
|
[5] |
黄伟, 纪双全, 苏浩轩, 等. 基于馈线偶的配网快速负荷均衡重构方法[J]. 现代电力, 2014, 31(04): 24-28.
|
[6] |
何禹清, 彭建春, 文明, 等. 配电网重构的最小可行分析对象及其快速算法[J]. 中国电机工程学报, 2010, 30(31): 50-56.
|
[7] |
ALONSO F R, OLIVEIRA D Q, ZAMBRONI DE SOUZA A C. Artificial immune systems optimization approach for multi-objective distribution system reconfiguration[J]. IEEE Transactions on Power Systems, 2015, 30(2): 840-847. doi: 10.1109/TPWRS.2014.2330628
|
[8] |
ELDURSSI A M, O'CONNELL R M. A fast non-dominated sorting guided genetic algorithm for multi-objective power distribution system reconfiguration problem[J]. IEEE Transactions on Power Systems, 2015, 30(2): 593-601. doi: 10.1109/TPWRS.2014.2332953
|
[9] |
任建文, 郭玉天. 基于环网编码和混合智能优化算法的配电网重构[J]. 现代电力, 2013, 30(03): 28-31.
|
[10] |
HAGHIGHAT H, ZENG B. Distribution system reconfiguration under uncertain load and renewable generation[J]. IEEE Transactions on Power Systems, 2016, 31(4): 2666-2675. doi: 10.1109/TPWRS.2015.2481508
|
[11] |
殷豪, 李德强, 葛佳菲, 等. 基于混合算法的含分布式电源配电网重构研究[J]. 电力建设, 2016, 37(4): 104-109.
|
[12] |
陈春, 汪沨, 刘蓓, 等. 基于基本环矩阵与改进和声搜索算法的配电网重构[J]. 电力系统自动化, 2014, 38(6): 55-60.
|
[13] |
王成山, 宋关羽, 李鹏, 等. 一种联络开关和智能软开关并存的配电网运行时序优化方法[J]. 中国电机工程学报, 2016, 36(9): 2315-2321.
|
[14] |
HOCHREITER R, PFLUG G C. Financial scenario generation for stochastic multi-stage decision processes as facility location problems[J]. Annals of Operations Research, 2007, 152(1): 257-272.
|
[15] |
黎静华, 韦化, 莫东. 含风电场最优潮流的Wait-and-See模型与最优渐近场景分析[J]. 中国电机工程学报, 2012, 32(22): 15-24.
|
[16] |
彭建春, 江辉. 基于两步联盟博弈的输电网损耗分配方法[J]. 中国电机工程学报, 2005, 25(4): 59-65.
|
[17] |
王超学, 崔杜武, 崔颖安, 等. 使用基于中医思想的蚁群算法求解配电网重构[J]. 中国电机工程学报, 2008, 28(7): 13-18.
|
[18] |
林济铿, 潘光, 李云鹏, 等. 基于基本树的网络拓扑放射性快速判断方法及配网重构[J]. 中国电机工程学报, 2013, 33(25): 156-166.
|
[19] |
何禹清, 彭建春, 文明, 等. 含风电的配电网重构场景模型及算法[J]. 中国电机工程学报, 2010, 30(28): 12-18.
|