Advanced Search

column
Excerpt from the Report on the Development of Rural Electrification(2)
Rural Electrification Committee of Chinese Society for Electrical Engineering
2020(2): 5-11. DOI: 10.13882/j.cnki.ncdqh.2020.02.001
Abstract PDF
Construction Related to Commerce Complex Management Platform in Wisdom Internet of Thing Based on Energy Resources Service
Che Liping, Zhang Zhousheng, Wang Hao
2020(2): 12-14. DOI: 10.13882/j.cnki.ncdqh.2020.02.002
Abstract PDF
Radio Interference Characteristics of Multi Circuit EHV AC Transmission Lines in Parallel
Huang Xiaolang
2020(2): 15-16. DOI: 10.13882/j.cnki.ncdqh.2020.02.003
Abstract PDF
Grid Division Method of Distribution Network Based on Three Elements
Xu Xiaoliang, Xiao Xinli, Ye Chen, Li Erxi, Hu Xidong, Huang Haihua
2020(2): 17-21. DOI: 10.13882/j.cnki.ncdqh.2020.02.004
Abstract PDF
Research on Fault Isolation Method of Distribution Network Based on Sectional Switch Configuratio
Xin Xin, Shan Caiwei, Li Zibing
2020(2): 22-23. DOI: 10.13882/j.cnki.ncdqh.2020.02.005
Abstract PDF
Interpretation and Analysis of D.C Power Supply System Operation Fault Case
Li Fang
2020(2): 24-25. DOI: 10.13882/j.cnki.ncdqh.2020.02.006
Abstract PDF
Fault Analysis and Treatment Measures of Main Transformers Common Automatic Closing Fault in Pulling Substation
Meng Xiangpeng
2020(2): 26-28. DOI: 10.13882/j.cnki.ncdqh.2020.02.007
Abstract PDF
Research and Checkout of A.C Power Be Invaded into D.C Power System Fault
Yang Hongwei
2020(2): 29-30. DOI: 10.13882/j.cnki.ncdqh.2020.02.008
Abstract PDF
Discussion on Operation and Maintenance Mode of Ring Network Cabinet in County Distribution Network
Yang Yao, Zhu Houyi
2020(2): 31-31. DOI: 10.13882/j.cnki.ncdqh.2020.02.009
Abstract PDF
A Multi Fault Analyses of Main Transformer Due to Small Animal in Substations
Du li
2020(2): 32-34. DOI: 10.13882/j.cnki.ncdqh.2020.02.010
Abstract PDF
Analysis and Treatment of C Phase H.V Bushing End Overheat in a Main Transformer in a Hydroelectric Station
Ma Yunfei, Han Jinhua, Wang Linan
2020(2): 35-37. DOI: 10.13882/j.cnki.ncdqh.2020.02.011
Abstract PDF
Defect Analysis of Relative Dielectric Loss Factor Over-proof in a 110 kV Current Transformer
Liu Zhao, Wang Jiangtao, Feng Zhengjun, Li Jingxue, Wang Dongmei, Zhang Shuai, Sun Zhe
2020(2): 38-40. DOI: 10.13882/j.cnki.ncdqh.2020.02.012
Abstract PDF
An Analysis Report Related to a 35 kV Transformer Oil Chromatographic Abnormality Case
Wang Shen, Yao Weifeng
2020(2): 41-42. DOI: 10.13882/j.cnki.ncdqh.2020.02.013
Abstract PDF
Construction and Application of Operation and Business Target Knowledge Atlas Suited to Power Network Enterprise
Li Zhixing, Wan Lei, Zhou Hongyan, Wang Guangjie, Deng Lin
2020(2): 43-46. DOI: 10.13882/j.cnki.ncdqh.2020.02.014
Abstract PDF
Research and Exploratory Related to LTE-G 230 Power Wireless Communication Special Network
Zhong Lijun, Shi Minda, Yu Ya, Gu Junjia, Shen Min
2020(2): 47-51. DOI: 10.13882/j.cnki.ncdqh.2020.02.015
Abstract PDF
Application of Power Distribution Networks Status Monitoring System in Power Distribution Networks Fault Treatment
Liu Siyuan, Li Aoxue, Wang Tongxu
2020(2): 52-56. DOI: 10.13882/j.cnki.ncdqh.2020.02.016
Abstract PDF
Collect System Design of Small Water Power Station Based on the Big Dipper Short Message Communication
Tao Xuefeng, Chen Yuanyuan, Xi Chaochao
2020(2): 57-58. DOI: 10.13882/j.cnki.ncdqh.2020.02.017
Abstract PDF
To Reduce Production Time Used to Put into Operation in a Substation
Yan Taishan, Tao Mengjiang, Zheng Xiaoqiong, Chai Hongbo, Shi Zhongyu, He Guangliang
2020(2): 59-62. DOI: 10.13882/j.cnki.ncdqh.2020.02.018
Abstract PDF
A Carrier-current Communication Fault Diagnostic Terminal Provided with Supporting Multi-communication Interface Agreement Function
Liang Jie
2020(2): 63-64. DOI: 10.13882/j.cnki.ncdqh.2020.02.019
Abstract PDF
Applied Practice of Related to Step Assessment for Cleared up and Bring Back Ability of New Energy Resources
Liu Qingjie, Wu Dan, Xiang Dongxu, Wu Chang, Li Zhen
2020(2): 65-67. DOI: 10.13882/j.cnki.ncdqh.2020.02.020
Abstract PDF
Research of Charging Pile Development Scale Suited to Electrical Vehicles
Zhang Aiqing, Zhang Haijun, Cai Fujia
2020(2): 68-69. DOI: 10.13882/j.cnki.ncdqh.2020.02.021
Abstract PDF
Explore and Research of Problem Existed in Cable Joint and Flexible Cable Explosion – proof Box Design
Sun Yifeng, Chen Ying, Luo Xiangming
2020(2): 70-71. DOI: 10.13882/j.cnki.ncdqh.2020.02.022
Abstract PDF
Development and Application of Dehydrating Breather Maintenance Device Suited to Large – scale Oil-immersed Power Transformer
Gao Chao
2020(2): 72-74. DOI: 10.13882/j.cnki.ncdqh.2020.02.023
Abstract PDF
LV line Loss Component and Reducing Loss Measure in Power Distribution Platform Area
Wang Jie
2020(2): 75-76. DOI: 10.13882/j.cnki.ncdqh.2020.02.024
Abstract PDF
Applied Result Comparison of Reinforcing Realistic Technology in Business Expansion Engineering
Yan Hong, Zhou Tao
2020(2): 77-78. DOI: 10.13882/j.cnki.ncdqh.2020.02.025
Abstract PDF
Enhancement of Radiating Heat Result Related to Forced Oil Circulation and Forced Air Cooling Power Transformers
Tian Fenglan, Wang Zhe, Hu Wei, Han Ting, Wang Ying, Zhao Quansheng
2020(2): 79-79. DOI: 10.13882/j.cnki.ncdqh.2020.02.026
Abstract PDF